Cebu-Cordova Link Expressway (CCLEX)

Cebu | Client: Metro Pacific Tollways Development Corporation

Roads, Highways and Bridges

8.9km expressway, twin pylon cable-stayed bridge

8.9 km

length

390 m long

main span

145 m high

twin pylons

27 m

wide

51 m

navigational clearance

60-80 kph

design speed

50,000 vehicles

serve daily

Metro Pacific Tollways Corporation (MPTC) awarded the Cebu Link Joint Venture (CLJV) the contract to design and build the 8.9-kilometer Cebu-Cordova Link Expressway (CCLEX) project. CLJV is composed of Spanish company Acciona Construccion S. A. and Filipino companies First Balfour, and D. M. Consunji Inc.

A landmark project, CCLEX connects the main Cebu City industrial area to Mactan Island via the municipality of Cordova. The expressway have two lanes in each direction and features the main twin cable-stayed bridge, viaduct approach bridges, a causeway, and toll facilities. Spanning eight kilometers from the mouth of the Guadalupe River to Shell Island and then Cordova, the project connects mainland Cebu to the Municipality of Cordova and is expected to serve at least 50,000 vehicles daily.

Other Projects

Roads in First Philippine Industrial Park (FPIP)

Roads, Highways and Bridges

Build an exciting future with us.

Contact Us

© 2023. First Balfour. All rights reserved.

Engineering & Construction Leader