First Balfour won a subcontract from JFE Engineering Corporation for the erection of structural steel bridges as part of the Subic-Clark-Tarlac Expressway Project Package 1. The scope included the erection of steel girders at Tipo (122 meters), Layac (240 meters) and Porac (400 meters).
First Balfour was responsible for the unloading of steel girders supplied by the client and their installation at the 3 project sites together with the installation of accessories. The special feature of the project is the use of large cranes with capacities of 150 tons, 160 tons, and 360 tons to erect the bridges.