The reliability of power transmission delivery to Metro Manila will be addressed through the development of new transmission corridors in Metro Manila such as the Taguig 500kV Substation (associated transmission lines – land portion).
NGCP is undertaking a number of new backbone projects to assure the long-term adequacy and reliability of connection between the NGCP grid and power plants that will go online in the future.
Design, supply, delivery, installation/construction, testing and commissioning of the following: Total towers at 52 with a total length of 21 kms.
Liveline installation of OPGW for Tayabas-San Jose 500kV T/L with a total length of 120 kms.
First Balfour partnered with specialist subcontractors to handle the liveline installation of OPGW.
Towers:52
Capacity: 500 kv
Transmission Line: 21 km