Taguig Transmission Line

Rizal | Client: National Grid Corporation of the Philippines

Power & Energy

Design and construction of a 21 km., 500 kV OHTL line in Baras-Morong-Binangonan, Rizal, which includes erection of 52 towers and liveline installation of optical ground wire for Tayabas-San Jose 500 kV.

52

Towers

500 kv

Capacity

21 km

Transmission Line

Other Projects

Kirahon Solar Farm

Power & Energy

Binga & Ambuklao Hydropower Plant

Power & Energy

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader