Novaliches-Balara Aqueduct 4 (NBAQ4)

Quezon City | Client: Manila Water

Tunneling

Design and construction of a 7.3-km long and 3.1-m diameter aqueduct from the La Mesa Reservoir, to the Balara Water Treatment Plant.

7.3 km

underground aqueuduct

3.8 m

cutting diameter

3.1 m

diameter of TBM

113 m

length of TBM

First Balfour, together with its joint venture partners CMC di Ravenna of Italy and Chun Wo Construction & Engineering of Hong Kong, entered into a contract with Manila Water to design and construct the PhP 5.3 billion Novaliches-Balara Aqueduct 4 (NBAQ4) project.

The NBAQ4 project is part of Manila Water’s improvement and expansion initiatives in the East Concession Area in coordination with the Metropolitan Waterworks and Sewerage System (MWSS). One of the largest and most important infrastructure projects it has undertaken to date, it involves the construction of a new intake facility at the La Mesa reservoir, a 7.3 kilometer underground aqueduct passing under Commonwealth Avenue, and an outlet facility at the Balara Water Treatment Plant. A Tunnel Boring Machine (TBM) will be used to build the aqueduct – a first time in the Philippines a TBM will be used in an urban setting.

Once completed and commissioned, the new aqueduct will be capable of delivering 1,000 MLD to the treatment plants ensuring the reliability and security of its raw water transmission system.

Other Projects

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader