Avion Power Plant

Batangas | Client: First Gen

Power & Energy

EPC for civil and balance of plant works for the 100MW Avion open-cycle natural gas-fired power plant

100MW

Capacity

The San Gabriel Avion Power Plant is a 97 MW dual-fired open cycle power plant in Brgy. Bolbok, Batangas City. Adjacent to the existing 1,000 MW Sta. Rita and 500 MW San Lorenzo combined cycle power plants, San Gabriel Avion serves as a peaker plant in that it shall run only when there is a peak demand for electricity. Being the first of its kind to run on indigenous liquid natural gas (LNG), it will be the latest addition to First Gen Corporation’s leading and ever growing list of renewable energy power plants upon project completion.

First Balfour’s role as general contractor on the project is one from the ground up, encompassing multiple disciplines through civil, mechanical, and electrical operations.

Other Projects

Tiwi and Mak-Ban Geothermal Complex

Power & Energy

Kirahon Solar Farm

Power & Energy

Burgos Wind Farm

Power & Energy

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader