150 MW Burgos Wind Farm

Project Description First Balfour was the Engineering, Procurement, and Construction (EPC) contractor for the civil works and electrical network of the 150 MW Burgos Wind Farm, the largest wind farm in Southeast Asia. The project included 13.6 kilometers of access roads and 50 concrete foundation structures for 50 units of 3 MW wind turbine generators. Approximately 630 cubic meters of concrete was used for the construction of foundations for each

Read More
115 KV Burgos-Laoag Overhead Transmission Line

Project Description First Balfour was the Engineering, Procurement, and Construction (EPC) contractor for the 43-kilometer transmission line project connecting the Burgos Wind Farm and Burgos substation to the Laoag Substation of the National Grid Corporation of the Philippines (NGCP). Passing through the municipalities of Burgos, Pasuquin, Bacarra and Laoag, the project consisted of 15 steel poles erected in Kapurpurawan, 5 steel poles erected inside the NGCP compound, and 128 steel

Read More
4.2 MW Burgos Solar Farm

Project Description First Balfour was the on-shore engineering, procurement, and construction (EPC) contractor for the 4.2 MW Burgos Solar Farm, a project which put Ilocos Norte at the forefront of renewable energy initiatives being the first locationin the world to host a combined solar and wind farm. Located on a 5.5 hectare site at Brgy. Saoit, the project included the installation of 13,420 photovoltaic modules/panels, their screw piles and mounting

Read More
12.5 MW Kirahon Solar Farm

Project Description In line with its mission to contribute to nation-building through the construction of energy development facilities across the country, First Balfour embarked on its second solar power project, this time in Mindanao. Similar to the Burgos Solar Farm Project in Ilocos Norte, the Kirahon Solar Project is a solar photovoltaic (PV) electric power generating facility. The project is located inside the Philippine Export Zone Authority and Phividec Industrial

Read More
N2N Relocation Project

Project Description First Balfour was involved in the relocation project of the 50 MW Northern Negros Geothermal Plant (NNGP) of the Energy Development Corporation (EDC) to the Southern Negros Geothermal Field in Valencia, Negros Oriental (SNGP). Given the limited steam supply to operate its original plant site in Northern Negros, EDC decided to relocate the facility to the Southern Negros Geothermal Production Field in Nasulo, thus the project name Northern

Read More
230 kV Sta. Rita to Calaca Transmission Line for the 1000MW Sta.Rita Combined Cycle Power Station

Project Description Detailed engineering design, construction and erection of 230KV overhead transmission line for the 1000mm Sta. Rita Combined Cycle Power Plant.

Read More
Main Civil Works for 1000MW Sta. Rita Combined Cycle Power Station

Project Description First Balfour was responsible for the construction of the main power plant and miscellaneous buildings, site development works, and sea water inlet/outlet structures. The project included 13.6 kilometers of access roads and 50 concrete foundation structures for 50 units of 3 MW wind turbine generators. Approximately 630 cubic meters of concrete was used for the construction of foundations for each wind turbine tower. Each wind turbine rests on

Read More
NPC Gas Pipeline Facility for the 1200MW Ilijan Combined Cycle Power Plant

Project Description The project involved the design, geological investigation, installation, testing and commissioning of a 13km natural gas pipeline of 16 inches diameter from the Shell Malampaya’s natural gas receiving facility in Tabangao, Batangas, passing through a mountainous area to the 1200MW Ilijan Natural Gas Combined Cycle Power Plant in Ilijan, Batangas. The main scope included installation of the pipeline including a river crossing at Tabangao River, installation of the