SCTEx Bridges

Pampanga, Bataan | Client: Metro Pacific Tollways Corporation

Roads, Highways and Bridges

Installation of precast concrete deck and concreting works for five (5) bridges: Tipo, Caulaman, Layac, Gumain, and Porac. Erection of steel girders at Tipo (122 meters), Layac (240 meters) and Porac (400 meters).

5

Main Bridge

First Balfour won a subcontract from JFE Engineering Corporation for the erection of structural steel bridges as part of the Subic-Clark-Tarlac Expressway Project Package 1. The scope included the erection of steel girders at Tipo (122 meters), Layac (240 meters) and Porac (400 meters).

First Balfour was responsible for the unloading of steel girders supplied by the client and their installation at the 3 project sites together with the installation of accessories. The special feature of the project is the use of large cranes with capacities of 150 tons, 160 tons, and 360 tons to erect the bridges.

Other Projects

SCTEx Bridges

Roads, Highways and Bridges

Roads in First Philippine Industrial Park (FPIP)

Roads, Highways and Bridges

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader