Nasulo Geothermal Plant

Negros Oriental | Client: Energy Development Corporation

Power & Energy

The project involves the relocation of the existing geothermal power plant in Northern Negros to a new location in Southern Negros (Valencia, Negros Oriental).

50MW

Capacity

First Balfour was involved in the relocation project of the 50 MW Northern Negros Geothermal Plant (NNGP) of the Energy Development Corporation (EDC) to the Southern Negros Geothermal Field in Valencia, Negros Oriental (SNGP).

Given the limited steam supply to operate its original plant site in Northern Negros, EDC decided to relocate the facility to the Southern Negros Geothermal Production Field in Nasulo, thus the project name Northern Negros to Nasulo Project or N2N.

The scope of work included site development, the design and construction of the power house building, pump houses, water tanks, cooling tower foundation access roads, and all other associated civil and structural works. First Balfour also worked on the new plant site’s lighting, fire protection, plumbing.

Other Projects

Subic Substation

Power & Energy

Burgos Substation

Power & Energy

Sta. Rita to Calaca Transmission Line

Power & Energy

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader