Design and build of a new manufacturing plant which includes a two-level semi-conductor facility with an area of 4,322 square meters. It has a cleanroom production area, material storage area, shipping area, offices, network room, cafeteria, kitchen and loading docks.

4,300 sq.m.

total area

The original contract for this project was for the construction of a world-standard, 2-level semiconductor facility with an approximate area of 4,322 sq. m. It has a clean room production area, material storage area, shipping area, offices, network room, cafeteria, and kitchen and loading docks.

After 2 months into the contract, First Balfour was awarded with the expansion which was about 64% of the original area and involved additional production and equipment areas. This expansion was done simultaneously with the ongoing construction of the original work scope.

Other Projects

Sound Stages

High-Value Buildings

TI Clark Facility

High-Value Buildings

Quezon City Data Center

Data Centers

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader