First Gen LNG Shelter-in-Place (SIP)
Batangas | Client: First Gen
High-Value Buildings
Shelter-in-place facility for the First Gen LNG Terminal
372 personnel
capacity20,000 sq. m.
total areaIn March 2021, First Balfour turned over the shelter-in-place (SIP) facility for the First Gen Liquefied Natural Gas (LNG) Terminal Project in Batangas City. The second SIP project First Balfour completed for First Gen, the LNG SIP facility sits on a 20,000-square meter area where over a hundred 20-footer container vans were set up to serve as temporary shelters. Awarded in November 2020, the newly-completed SIP facility can accommodate a total of 372 personnel working on the Onshore Gas Receiving Facility (OGRF) of the LNG Project.
With the ongoing threat of the virus, the completion of the SIP facility will enable First Gen to ensure the health and safety of its personnel while continuing critical works for the LNG Terminal, a key initiative towards the Group’s mission towards building a decarbonized and regenerative future.
Other Projects
Yazaki-Torres Manufacturing Plant
High-Value Buildings