Track Record

Power & Energy

First Balfour Head Office Solar Rooftop

Power & Energy

Design and construction of a 100 kWp solar rooftop

Hermosa-San Jose Transmission Line

Power & Energy

83-km, 500kV overhead transmission line with 230 towers

Taguig Transmission Line

Power & Energy

21-km., 500kV overhead transmission line with 52 towers

Sta. Rita to Calaca Transmission Line

Power & Energy

EPC of a 230kV quad bundle overhead transmission line

Burgos Substation

Power & Energy

Civil and electro-mechanical works for the 115 kV Burgos Substation

Subic Substation

Power & Energy

EPC of 2x50 MW substation in Subic

Ilijan Natural Gas Pipeline

Natural Gas

Gas pipeline project for the Ilijan Combined-Cycle Power Plant

Binga & Ambuklao Hydropower Plant

Power & Energy

Installation of turbines. Rehabilitation of 3 Francis Hydro Units

Page 2 of 3

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader