Caloocan Pipelaying

Caloocan | Client: Maynilad

Water Infrastructure

The project is a pipe replacement of 20km above ground water pipes. The work includes pavement cutting and breaking (on ramp/driveways), interconnections and service connection works.

20-km

pipelaying works

Other Projects

Balara Reservoir

Water Infrastructure

FPIP Sewage Treatment Plant

Water Infrastructure

Maguey Reservoir

Water Infrastructure

Build an exciting future with us.

Contact Us

© 2020. First Balfour. All rights reserved.

Engineering & Construction Leader