N2N Relocation Project

Project Description First Balfour was involved in the relocation project of the 50 MW Northern Negros Geothermal Plant (NNGP) of the Energy Development Corporation (EDC) to the Southern Negros Geothermal Field in Valencia, Negros Oriental (SNGP). Given the limited steam supply to operate its original plant site in Northern Negros, EDC decided to relocate the facility to the Southern Negros Geothermal Production Field in Nasulo, thus the project name Northern

Read More
230 kV Sta. Rita to Calaca Transmission Line for the 1000MW Sta.Rita Combined Cycle Power Station

Project Description Detailed engineering design, construction and erection of 230KV overhead transmission line for the 1000mm Sta. Rita Combined Cycle Power Plant.

Read More
Main Civil Works for 1000MW Sta. Rita Combined Cycle Power Station

Project Description First Balfour was responsible for the construction of the main power plant and miscellaneous buildings, site development works, and sea water inlet/outlet structures. The project included 13.6 kilometers of access roads and 50 concrete foundation structures for 50 units of 3 MW wind turbine generators. Approximately 630 cubic meters of concrete was used for the construction of foundations for each wind turbine tower. Each wind turbine rests on

Read More
NPC Gas Pipeline Facility for the 1200MW Ilijan Combined Cycle Power Plant

Project Description The project involved the design, geological investigation, installation, testing and commissioning of a 13km natural gas pipeline of 16 inches diameter from the Shell Malampaya’s natural gas receiving facility in Tabangao, Batangas, passing through a mountainous area to the 1200MW Ilijan Natural Gas Combined Cycle Power Plant in Ilijan, Batangas. The main scope included installation of the pipeline including a river crossing at Tabangao River, installation of the

Read More